Text Box: During the past two years, RPM Engineers has been involved in the design of several exciting projects for various clients including the West Virginia Department of Transportation/Division of Highways and the Ohio County Development Authority.  Some of these include:

Text Box: Design. Build. Inspect.

Text Box: RPM Engineers, Inc.

Text Box: RPM is designing and developing contract plans for 1,200 feet of curved approach spans along with the piers and abutments. This structure consists of approach spans of nearly 300 feet in length.  It is the first LRFD curved girder design in West Virginia.

Text Box: I-64 Bridge over the Kanawha River, Kanawha County, WV  
Project Owner: WVDOT/DOH
 
 

Text Box: Project List

Text Box: RPM is part of a team selected to design a new interchange in Ohio County, WV for the Ohio County Development Authority as part of The Highlands development.  RPM’s portion of the work includes the fast-track design of a new bridge over I-70, a 1.5 mile access road, and construction inspection services.

Text Box: RPM was selected under a WVDOT State Wide Engineering Agreement to perform a concrete deck pour sequence analysis of the superstructure to determine the structures stability during construction.  A finite element analysis was performed for the various stages of construction loads.

Text Box: Lost River #2 Bridge, Hardy County, WV
Project Owner: WVDOT/DOH
 
 

Text Box: RPM is part of a team selected to design a new interchange on I-81 in Berkeley County, WV.  The project includes 2 bridges, 2 miles of new 4-lane highway, and a 1.0 mile Industrial Access Road.  RPM is currently responsible for the design of the Industrial Access Road.

Text Box: Tabler Station Interchange, Berkeley County, WV
Project Owner: WVDOT/DOH
 
 

Text Box: I-70 Interchange and Access Road, Ohio County, WV
Project Owner: Ohio County Development Authority
 
 

Text Box: RPM Engineers is part of a team responsible for the Bridge Inspection on Richard Henderson Memorial Bridge three times over the next six years.  The structure consists of 550’ of approach spans and a 850’ 3 span truss over the Kanawha River.

Text Box: Richard Henderson Bridge Inspection, St. Albans, WV
Project Owner: WVDOT/DOH